| 1 | Pump duty and operating envelope | The pump must meet the project’s required LNG transfer flow and differential pressure across the defined operating range, including start-up and turndown conditions. | Rated and minimum stable flow; differential head or pressure; operating range; pump curves; LNG design conditions; motor power. | Project design basis; approved pump datasheet. |
| 2 | Cryogenic materials and thermal design | Pressure-containing parts, seals, and connections must be suitable for the specified minimum design temperature and LNG service; thermal contraction and cool-down effects must be addressed. | Minimum design temperature; material specifications and traceability; seal details; thermal-stress and cool-down procedures. | Applicable piping and equipment codes; project material specifications. |
| 3 | Pump configuration and LNG containment | The selected arrangement—such as a submerged or external cryogenic pump—must suit the vessel layout and minimize leak paths, vapor release, and maintenance hazards. | Pump arrangement drawings; shaft-seal or seal-less design details; containment boundaries; maintenance and removal method. | Project risk assessment; equipment design documentation. |
| 4 | Suction conditions and cavitation control | The installation must maintain adequate suction conditions for the specified LNG temperature, pressure, and flow; vapor formation and loss of prime must be considered. | Required and available NPSH where applicable; suction pressure limits; minimum submergence; vapor-handling and start-up limits. | Pump manufacturer’s certified curves; system hydraulic analysis. |
| 5 | Piping, supports, and vessel integration | Skid piping and supports must account for pressure, cryogenic contraction, vibration, vessel motions, and loads transferred at connected equipment and interfaces. | Piping isometrics; stress and support calculations; nozzle loads; skid footprint, mass, center of gravity, and lifting points. | ASME B31.3 where adopted; vessel and project structural design criteria. |
| 6 | Hazardous-area electrical equipment | Motors, instruments, junction boxes, and other electrical equipment must be suitable for the classified locations and protection concepts specified for the vessel. | Hazardous-area equipment schedule; zone and gas-group suitability; temperature class; certification and installation details. | IEC 60079 series; project hazardous-area classification. |
| 7 | Instrumentation, alarms, and trips | Controls should monitor relevant process conditions and provide defined alarms and protective actions for abnormal operation, based on the project hazard analysis. | Instrument list; alarm and trip setpoints; cause-and-effect chart; shutdown interfaces; safety-integrity documentation where required. | IEC 61511 where safety instrumented functions are specified; project control philosophy. |
| 8 | Emergency shutdown and bunkering interfaces | The pump skid must interface with the bunkering system’s agreed shutdown logic and transfer procedures, including safe response to an emergency stop or loss of required communications. | Interface list; ESD signal and valve logic; shutdown sequence; communication requirements; interface test procedure. | ISO 20519; project bunkering and ESD philosophy. |
| 9 | Leak detection, ventilation, and hazardous release controls | The skid layout and vessel integration must address potential LNG or gas releases, detector placement, ventilation, access, and protection of personnel and adjacent equipment. | Gas-detection and ventilation interfaces; hazardous-area drawings; leak scenarios; inspection and maintenance access provisions. | Project hazardous-area study; applicable marine and LNG bunkering requirements. |
| 10 | Testing, documentation, and lifecycle support | The supplier should provide a traceable quality record and a test plan covering the agreed scope, including inspection, functional checks, commissioning support, and maintenance needs. | Inspection and test plan; material records; pressure or leak-test records as applicable; functional test procedures; manuals; spare-parts and service plan. | Contract quality plan; project inspection and commissioning requirements. |