| Application and duty-point fit | 20% | Confirm that the pump is designed for the intended scavenging duty. Define required flow, inlet conditions, fluid properties, operating cycle, and installation orientation. | Completed application questionnaire and a written confirmation of the proposed operating range. | Enter score |
| Hydraulic performance data | 15% | Check flow and pressure or vacuum performance at the specified speed and fluid conditions. Review performance curves and any stated limits on viscosity, temperature, or inlet pressure. | Model-specific performance curve, datasheet, and stated test conditions. Ensure the data match the requested duty point. | Enter score |
| Materials and fluid compatibility | 12% | Verify wetted materials, casing and rotor materials, elastomers, and seal materials against the actual fluid, temperature, and operating environment. | Bill of materials or materials list, seal options, and written compatibility confirmation for the specified fluid. | Enter score |
| Testing and inspection | 10% | Establish which tests are included, the acceptance criteria, and whether testing is performed on each unit or on a sampling basis. | Sample factory test report, inspection plan, and details of any available witness or acceptance testing. | Enter score |
| Quality management and traceability | 10% | Review the supplier’s quality controls, component traceability, nonconformance handling, and document retention. Verify certificate scope and validity where certification is claimed. | Current quality-system certificate, certificate scope, inspection records, and sample traceability documentation. | Enter score |
| Regulatory and project compliance | 8% | Identify requirements for the destination market and installation, including applicable electrical, machinery, environmental, and hazardous-area requirements where relevant. | Compliance statement and relevant declarations or certificates for the specific pump configuration and intended market. | Enter score |
| Service, spare parts, and technical support | 8% | Check access to wear parts, maintenance instructions, troubleshooting assistance, and support in the buyer’s time zone or region. | Recommended spare-parts list, maintenance schedule, support contact details, and written parts-availability terms. | Enter score |
| Lead time and delivery capability | 7% | Compare quoted production and shipping lead times, packaging suitability, export documentation, and the supplier’s ability to meet the project schedule. | Written delivery schedule, shipping terms, packaging details, and a list of export documents supplied. | Enter score |
| Lifecycle cost and maintainability | 5% | Consider energy use, expected maintenance tasks, replaceable components, service intervals, and the cost and availability of consumables. | Operating and maintenance manual, recommended maintenance intervals, and spare-parts quotation. | Enter score |
| Commercial terms and warranty | 5% | Review price scope, payment terms, warranty coverage and exclusions, claim process, and the remedy offered for verified defects. | Formal quotation, warranty document, and written clarification of exclusions and claim procedures. | Enter score |