| Ingress protection | IP code under IEC 60529, including which surfaces are protected | For a washdown-facing control-panel installation, verify the required protection for the front, rear, connectors, and enclosure as installed. An IP65 front panel does not mean the entire computer is IP65. | Test report or declaration identifying the tested model, seals, connectors, and mounting conditions |
| Enclosure rating | NEMA 250 type, if required by the project or local specification | Do not treat NEMA type numbers and IP codes as directly interchangeable. Confirm the rating covers the complete enclosure and the intended installation. | Manufacturer documentation or test evidence for the specified enclosure configuration |
| Operating temperature | Specified operating range for the complete computer, including display and touch function | Compare the rated range with measured ambient temperature inside the cabinet, not just the room temperature. Check any performance limits, such as reduced brightness or CPU speed at temperature extremes. | Datasheet conditions and test results for the exact panel size and configuration |
| Humidity and condensation | Humidity limits, condensation restrictions, and any conformal coating claims | A humidity rating does not necessarily mean the unit can operate with condensation. For damp or rapidly changing environments, review enclosure sealing and installation practices. | Environmental specification and stated test method or operating conditions |
| Shock and vibration | Applicable IEC 60068 test methods and the tested severity, mounting, and operating state | Select test levels based on the machine or vehicle environment. A reference to IEC 60068 alone does not establish that a product meets a particular vibration or shock level. | Test report specifying method, frequency or acceleration, duration, axes, and mounting arrangement |
| EMC immunity and emissions | Applicable EMC standards, such as IEC 61000-6-2 for industrial immunity and IEC 61000-6-4 for industrial emissions, where relevant | Check the requirements for the intended location and system. EMC performance can depend on cable type, grounding, installation, and connected peripherals. | Declaration and test documentation for the product configuration and applicable standards |
| Electrical safety | Applicable safety standard, which may include IEC 61010-1 or IEC 62368-1 depending on product design and intended use | Confirm the standard and certification route required by the destination market and application. A standard should not be assumed to apply to every industrial panel computer. | Safety certificate or declaration covering the exact model, power supply, and accessories used |
| Regulatory documentation | Market-specific EMC, radio, and safety requirements; applicable declarations and labels | A CE marking is generally supported by the manufacturer's declaration of conformity; it is not, by itself, proof of independent third-party testing. Check other national requirements where the equipment will be sold or installed. | Current declaration of conformity, applicable test reports, and product labeling details |
| Cooling and moving parts | Fanless or fan-cooled design, thermal limits, and required clearance | Fanless designs can reduce maintenance associated with fans, but still require adequate heat dissipation. Verify thermal performance at the intended ambient temperature and mounting orientation. | Thermal test data, installation clearances, and maintenance requirements |
| Reliability claims | MTBF figure, calculation or test method, assumptions, and covered components | MTBF is a statistical reliability estimate for a population under stated assumptions; it is not a guaranteed service life or a promise that an individual unit will operate for that duration. | Reliability report stating method, operating conditions, and exclusions |
| Long-term serviceability | Warranty terms, repair process, spare-part availability, and product-change notification | For equipment expected to remain in service for years, assess replacement options and operating-system or component lifecycle before purchase. | Written warranty, support policy, and lifecycle or change-management statement |