| ISO 9001 quality management system | Current certificate showing the standard edition, certified legal entity, site address, scope, issue date, and expiry date. | Confirm the certificate is valid with its issuing certification body. Check that the certified site and scope cover the facility and activities relevant to the resistor order. | Pass if current, independently verifiable, and applicable to the manufacturing site and scope. |
| IATF 16949 quality management system | Current IATF 16949 certificate and details of the certified manufacturing site and product scope. | Check validity through the certification body and relevant IATF verification channels. Ensure the certificate belongs to the facility that will make the parts, not only an affiliated office or another site. | Pass when valid and site-specific. If automotive qualification is required, treat this as a key requirement. |
| Certificate scope and site match | Certificate annexes, site list, and a written confirmation of the proposed production location. | Compare the legal entity, address, and scope on the certificate with the quotation, audit records, and manufacturing address. | Hold if the production site is not covered or the supplier cannot explain a mismatch. |
| Custom resistor capability | Capability statement covering resistor type, resistance range, tolerance, power rating, dimensions, materials, and applicable operating conditions. | Compare the stated capability with the drawing and specification. Ask for a feasibility review and written confirmation of any limits or assumptions. | Pass if every critical requirement is confirmed in writing; do not infer capability from a catalogue alone. |
| Engineering change control | Documented process for approving changes to materials, design, process, equipment, or manufacturing location. | Ask how changes are reviewed, approved, recorded, and communicated before implementation. | Pass if changes require customer notification or approval when contractually or technically required. |
| Inspection and test controls | Inspection plan, sample test reports, equipment calibration records, and acceptance criteria for agreed product characteristics. | Check that the test methods and limits match the approved drawing or specification, and that measurement equipment is controlled. | Pass if the supplier can provide traceable results for agreed critical characteristics. |
| Lot traceability | Example lot records linking finished product to production date, batch or lot number, inspection results, and relevant material records. | Request a sample traceability exercise for a finished lot and confirm the records can be retrieved. | Pass if the supplier can demonstrate documented, consistent lot identification and retrieval. |
| Sample and production approval | Prototype samples, dimensional and electrical test results, and an agreed process for approving pre-production samples. | Approve samples against the customer’s drawing and test requirements before authorizing regular production. | Pass after documented sample approval; certification alone does not approve a custom design. |
| Corrective action and nonconformance handling | Written complaint, containment, root-cause, corrective-action, and effectiveness-check procedures. | Review a suitably anonymized example report and check that actions address the cause, not just the affected batch. | Pass if responsibilities, response steps, and follow-up are documented and clear. |
| Product compliance and customer requirements | Material declarations and compliance documents applicable to the destination market and the buyer’s stated requirements. | Identify applicable regulations and contractual requirements first; review documents for product, material, and revision applicability. | Pass when the evidence matches the ordered product and applicable requirements. |
| Overall supplier decision | Completed document review, technical feasibility confirmation, sample results, and any required site audit. | Evaluate certification validity separately from technical capability, product approval, delivery performance, and commercial terms. | Approve only after mandatory requirements are met and open risks have documented owners and actions. |