| Part and material match | Rubber compound, part number, nominal dimensions, hardness scale and value, and flash location or thickness. | Submit production parts from the actual compound and tooling. Include parts with typical variation, not only hand-picked samples. | A written trial record identifies the tested part, material, incoming condition, and any parts excluded from the test. | Deflashing results can change with compound, geometry, flash condition, and part temperature. |
| Flash removal | Residual flash by location, number of parts meeting the agreed visual or dimensional standard, and any rework required. | Inspect parts under consistent lighting and magnification where appropriate. Use a defined sample size, such as 30 parts per run, and record defects by type. | Results meet the agreed drawing, visual standard, or customer inspection criteria; borderline parts are identified separately. | “Clean” should have a defined inspection standard rather than rely on a general visual claim. |
| Part damage and dimensional condition | Cuts, nicks, surface marks, deformation, dimensional changes, or damage to functional edges. | Compare processed parts with unprocessed controls. Measure critical features using the same method before and after processing. | No damage exceeds the agreed defect limits, and critical dimensions remain within the part drawing tolerances. | A process that removes flash but harms the sealing surface or critical geometry is not suitable. |
| Throughput and cycle time | Parts loaded, accepted parts, processing time, unloading time, and operator handling time. | Time complete runs under the proposed production loading pattern. Repeat the run to account for loading and unloading variation. | Recorded output meets the required production rate after accounting for inspection, rework, and routine handling. | Machine cycle time alone may not represent actual production throughput. |
| Repeatability | Pass rate, residual-flash observations, damage findings, and cycle time for each run. | Run the same agreed recipe at least three times using comparable parts and loading conditions. | All runs meet the agreed acceptance criteria, with run-to-run variation documented and explained. | Repeated trials help reveal inconsistent results that a single demonstration may miss. |
| Process settings and operating cost | Machine settings, media or consumable use where applicable, energy use where measurable, cleaning needs, and changeover time. | Ask the supplier to document the settings used and the consumables required for the tested part and batch size. | The process recipe is reproducible, and expected operating inputs can be reviewed against the buyer’s production plan. | Settings and consumables affect both ongoing cost and the ability to reproduce trial results. |
| Changeover and operator requirements | Setup steps, tooling or recipe changes, training time, operator tasks, and required personal protective equipment. | Observe a changeover between representative parts or recipes and record the steps that require supplier assistance. | Setup instructions are documented, and the required operator training and safety measures are identified. | Frequent product changes can make setup time and ease of use important selection factors. |
| Supplier support and trial documentation | Trial report, proposed machine configuration, training, installation scope, spare parts, service coverage, and response commitments. | Request written answers to technical questions and a support plan covering installation, commissioning, troubleshooting, and maintenance. | Responsibilities, deliverables, service terms, and agreed response times are documented before purchase. | Clear support commitments make it easier to move from a successful trial to stable production. |
| Decision rule: Select a machine only after the trial meets written quality, throughput, repeatability, safety, and support requirements. Confirm that the tested parts and process conditions match the intended production application. |