20–63 mm (0.75–2.5 in) | Small service lines, irrigation branches, and low-volume utility connections. | Compact manual or hydraulic fusion unit with 2 or 4 self-centering clamps; interchangeable inserts may be required for smaller diameters. | Approximately 90–160 mm | 20–63 mm | 204–232 °C (400–450 °F) | Choose a machine that provides stable alignment at small diameters. Check that the inserts match the actual pipe outside diameter rather than only the nominal pipe size. |
63–160 mm (2.5–6 in) | Building water services, irrigation mains, and small municipal distribution lines. | 4-jaw self-centering clamps with manual or hydraulic closing; use pipe supports to prevent sagging during facing and heating. | Approximately 160–250 mm | 63–160 mm | 204–232 °C (400–450 °F) | Verify that the clamp stroke can accommodate the pipe and that the facing tool can produce parallel, square pipe ends without excessive material removal. |
110–250 mm (4–10 in) | Water distribution, gas distribution, and industrial utility piping. | Hydraulic 4-jaw machine with independent or synchronized clamp movement and a dedicated pipe support stand. | Approximately 250–350 mm | 110–250 mm | 204–232 °C (400–450 °F) | Hydraulic pressure should be controlled according to the approved fusion procedure. The machine must accommodate the pipe wall thickness and required drag pressure. |
160–315 mm (6–12 in) | Municipal water mains, sewer force mains, and medium-size process piping. | Hydraulic 4-jaw or 6-jaw alignment system with adjustable pipe rollers and sufficient carriage travel for the fitting or pipe section. | Approximately 315–450 mm | 160–315 mm | 204–232 °C (400–450 °F) | Use rigid supports on both sides of the machine. Confirm that the clamps can maintain alignment under the combined effects of pipe weight and drag. |
250–450 mm (10–18 in) | Large municipal pipelines, industrial water systems, and mining or slurry services. | Heavy-duty hydraulic 4-jaw or 6-jaw machine with reinforced clamps, long carriage travel, and adjustable roller supports. | Approximately 450–600 mm | 250–450 mm | 204–232 °C (400–450 °F) | Confirm hydraulic capacity, clamp opening, and heater plate flatness. Large-diameter pipes require careful control of alignment, drag pressure, and cooling time. |
355–630 mm (14–24 in) | Transmission water lines, large sewer systems, industrial plants, and infrastructure projects. | Heavy-duty hydraulic machine with wide clamp opening, multi-point support, and a stable lifting or positioning system. | Approximately 600–800 mm | 355–630 mm | 204–232 °C (400–450 °F) | Check transport and lifting requirements as well as working clearance. The heater should provide uniform surface temperature across the full fusion area. |
500–1000 mm (20–40 in) | Large-diameter water transmission, intake and outfall systems, and specialized industrial pipelines. | Heavy-duty hydraulic or remotely operated machine with reinforced 4-jaw or 6-jaw clamps, adjustable supports, and high-capacity carriage movement. | Approximately 800–1200 mm | 500–1000 mm | 204–232 °C (400–450 °F) | Use a qualified fusion procedure for the specific pipe material, outside diameter, SDR, and wall thickness. Verify heater uniformity, hydraulic pressure control, and adequate cooling restraint. |