| Applicable code requirements | Confirm the locally adopted building code edition, occupancy, building conditions, and whether NFPA 285 testing or an approved alternative is required. | Requirements and permitted exceptions depend on the adopted code and project conditions; they are not identical for every building. | Code analysis and written confirmation from the design team or authority having jurisdiction. |
| Test scope | Check that the evidence identifies an NFPA 285 test of an exterior wall assembly, rather than a flame-spread result or test of a single panel alone. | NFPA 285 evaluates fire propagation on and within a wall assembly under the test method; a panel-only result does not establish that the complete wall assembly complies. | Complete test report or code-recognized engineering analysis, as applicable. |
| Cladding and attachment | Compare cladding material, thickness, joints, attachment method, and any ventilated cavity with the tested or approved assembly. | Changes to materials, geometry, or attachment can affect the wall’s fire behavior and may fall outside the evidence. | Assembly drawings and a documented comparison against the test or approved design. |
| Water-resistive barrier and insulation | Verify the type and location of water-resistive barriers, air barriers, insulation, and any other combustible layers. | These layers are part of the wall system and can influence fire propagation even when they are concealed behind the cladding. | Wall-section details, material schedules, and report-listed assembly components. |
| Substrate and framing | Check the stated sheathing, substrate, framing type, and relevant cavity or stud-space details. | The supporting wall construction is part of the tested assembly; matching the visible cladding alone is insufficient. | Structural and architectural wall sections cross-checked against the test configuration. |
| Openings and fire-stopping details | Review window openings, perimeter details, cavity barriers, and fire-stopping where applicable to the design and evidence. | Interruptions and transitions can affect how fire moves through or across a wall; details should be coordinated with the approved assembly. | Opening details and installation specifications reviewed by the project fire and façade teams. |
| Scope of approved variations | Identify any permitted substitutions or limits stated in the test report, evaluation, or engineering analysis; do not assume an unlisted change is acceptable. | Evidence applies to its stated configuration and scope. A qualified professional and the authority having jurisdiction may need to review proposed deviations. | Written variation assessment linked to the specific project assembly. |
| Document control and installation | Use the current, complete evidence and ensure construction documents and field installation match the approved wall build-up. | Compliance depends on the installed assembly being consistent with the accepted design, not merely on having a test report on file. | Controlled report, approved submittals, inspection records, and documented change approvals. |