| 3-Axis CNC Machining | Prismatic parts, plates, brackets, housings, and prototypes with accessible features | Approximately ±0.05 mm to ±0.10 mm, depending on material, geometry, and inspection requirements | Approximately Ra 1.6–3.2 µm after standard milling | Aluminum, stainless steel, carbon steel, brass, copper, engineering plastics | Prototype to low- and medium-volume production | Approximately 5–15 business days after drawing approval |
| 4-Axis CNC Machining | Components requiring indexed machining around multiple sides, radial holes, and cylindrical features | Approximately ±0.03 mm to ±0.08 mm, subject to part size and production setup | Approximately Ra 0.8–3.2 µm with suitable tooling and finishing passes | Aluminum alloys, stainless steel, tool steel, brass, bronze, plastics | Complex prototypes and low- to medium-volume components | Approximately 7–18 business days after design and process review |
| 5-Axis CNC Machining | Impellers, aerospace-style parts, medical components, molds, curved surfaces, and deep or angled features | Approximately ±0.01 mm to ±0.05 mm for suitable geometries and controlled processes | Approximately Ra 0.4–1.6 µm with fine finishing operations | Aluminum, titanium, stainless steel, nickel alloys, tool steel, engineering plastics | High-complexity prototypes and small- to medium-batch production | Approximately 10–25 business days after technical approval |
| CNC Turning | Shafts, pins, bushings, threaded parts, fittings, and rotational components | Approximately ±0.02 mm to ±0.08 mm, depending on diameter and tolerance class | Approximately Ra 0.8–3.2 µm after standard turning | Aluminum, stainless steel, carbon steel, brass, bronze, plastics | Prototype, replacement parts, and small- to high-volume production | Approximately 5–15 business days after order confirmation |
| Inspection and Quality Control | Dimensional verification, first-article inspection, and batch quality checks for export components | Inspection scope defined by the engineering drawing, tolerance notes, and agreed control plan | Surface roughness measurement available when specified by the drawing or purchase order | Applicable to metal and engineering-plastic components | Sampling inspection or 100% inspection according to project requirements | Inspection records typically available before shipment when requested |
| Post-Machining Finishing | Parts requiring improved corrosion resistance, appearance, wear resistance, or surface uniformity | Final dimensions should account for coating or plating thickness where applicable | Anodizing, passivation, electroless nickel, powder coating, polishing, brushing, and bead blasting | Aluminum, stainless steel, carbon steel, copper alloys, and selected plastics | Prototype and production parts with specified cosmetic or functional finishes | Usually adds approximately 3–10 business days, depending on the finish |