| 1. Requirement Definition | Target application, magnification, objective diameter, reticle type, mounting interface, operating environment, target market, and estimated annual volume. | Requirement review, feasibility feedback, preliminary specification sheet, and open-question list. | Optical performance targets, mechanical envelope, battery requirements, environmental exposure, regulatory needs, and packaging constraints. | 3–7 business days | Approved technical brief |
| 2. OEM Partnership Review | Expected order quantity, forecast, destination countries, preferred incoterm, target cost, payment conditions, and intellectual-property requirements. | Quotation, minimum order quantity, production capacity statement, tooling estimate, sample policy, and proposed commercial terms. | Capacity allocation, component sourcing risk, export documentation capability, confidentiality controls, and after-sales process. | 5–10 business days | Commercial and technical alignment |
| 3. Optical and Mechanical Design | Approved specifications, logo artwork if applicable, reticle requirements, user interface preferences, and mounting details. | 2D drawings, 3D design files, optical layout, bill of materials, interface drawings, and design-for-manufacturing review. | Field of view, eye relief, adjustment range, parallax setting, sealing interfaces, material selection, and serviceability. | 2–5 weeks | Design freeze approval |
| 4. Prototype and Engineering Sample | Sample quantity, inspection checklist, evaluation schedule, and required packaging or labeling format. | Prototype units, sample inspection report, test records, revised drawings, and engineering change recommendations. | Image quality, reticle alignment, adjustment repeatability, focus operation, control function, finish quality, and assembly fit. | 3–8 weeks | Buyer sample approval |
| 5. Tooling and Process Preparation | Final artwork, approved sample, packaging specification, inspection criteria, and purchase-order release. | Tooling plan, work instructions, inspection fixtures, assembly flow, control plan, and production schedule. | Critical-to-quality dimensions, incoming-material inspection, calibration status, traceability method, and operator inspection points. | 2–6 weeks | Production-readiness approval |
| 6. Pilot Production | Pilot-lot acceptance criteria, sampling level, independent inspection requirements, and approval authority. | Pilot batch, first-article report, defect analysis, process capability findings, and corrective-action plan where required. | Assembly consistency, optical axis alignment, reticle position, adjustment tracking, sealing, surface finish, and functional testing. | 1–3 weeks | Pilot lot released for mass production |
| 7. Mass Production | Purchase order, confirmed quantity, delivery window, approved packaging, and payment according to agreed terms. | Manufactured and assembled units, batch records, production updates, and shipment-readiness notice. | Incoming, in-process, and final inspection; calibration records; functional testing; cosmetic inspection; quantity reconciliation. | 4–10 weeks | Finished-goods acceptance |
| 8. Final Quality Inspection | Inspection method, acceptable quality limit, required certificates, and pre-shipment approval process. | Final inspection report, product photographs, carton list, serial-number list where applicable, and certificate package. | Quantity, workmanship, dimensions, operation, optical appearance, accessories, labeling, cartons, and documentation completeness. | 2–5 business days | Pre-shipment approval |
| 9. Export Packing and Documentation | Consignee details, shipping instructions, customs information, labeling language, and required commercial documents. | Commercial invoice, packing list, transport document, origin documentation where applicable, and export declaration support. | Carton protection, moisture control, palletization, shipping marks, document consistency, and destination-country requirements. | 2–7 business days | Cargo handed to logistics provider |
| 10. International Delivery | Preferred transport mode, customs broker, delivery appointment, and receiving inspection plan. | Shipment tracking, dispatch confirmation, document updates, and exception handling. | Transit protection, customs status, delivery condition, quantity received, and damage reporting. | Air: 3–10 days Sea: 20–45 days | Delivered to buyer or nominated warehouse |
| 11. After-Sales and Continuous Improvement | Field feedback, warranty claims, replacement requirements, sales forecast, and product-improvement requests. | Root-cause analysis, corrective-action report, spare-parts support, replacement process, and revision-control updates. | Failure classification, response time, recurring-defect monitoring, change approval, and retained product records. | Ongoing; response commonly within 1–5 business days | Closed-loop OEM support |